MTA work event, 2023-01-22

by Dimitri Timohovich, RRS.ORG


The RRS held a work event at the MTA to continue the work on the restroom. It was a four day event starting, Sunday, January 22nd and ending Wednesday, January 25th. Several members came out throughout this event to help.

On the first day, we cleaned up the Creosote bushes around the Dosa building and between Dosa building and the pit toilet.  The pit toilet platform was releveled. Our pit toilet has always been a simple stopgap measure until our more grand facility goes into service.

Several people got trained in using the loader to scrape and smooth out the area. I put together scaffolding and prepped the jobsite. Started to install electrical in both bathrooms.

Less bursh means more space at the MTA.

On the second day, we installed shelves in maintenance area and mounted the water pump and water heater. Started to put together the drainage pipes inside the container and assembled the shower drain.

Batteries, water pump and water heater installed.

On the third day, Installed hand rails around toilet in handicap bathroom. Installed sink braces and Installed storage cabinets in both bathrooms. Finished up drainage pipe inside the container. Rented trencher and started laying in the conduit from Dosa building to container.

Sewer header

On the last day, I finished trenching and returned the trencher. Finished laying conduit into the trench then covered up the trench and packed the dirt down.

All in all, a successful event, but there’s more work before the restroom is operational. We’ll have another work event in mid-February 2023. Details to follow later.

Many thanks to Keith Yoerg, Leanna Lincoln, Bill Inman, Osvaldo Tarditti, Joe Dominguez, Waldo Stakes and Dave Nordling who helped.