MTA Firing Event, 2024-04-27

by Dave Nordling, Reaction Research Society


The UCLA hybrid rocket team had a static fire event at the RRS Mojave Test Area (MTA) on Saturday, April 27, 2024, under dry and fair weather. Osvaldo Tarditti was the pyrotechnic operator in charge. I was able to assist him a few times in monitoring the progress. The UCLA team has advanced their custom grain and motor design and has improved their nitrous oxide feed system over the last few years. After having some operational challenges and resolving some leak testing issues, UCLA was able to conduct two static firings from the RRS MTA vertical test stand.

Bill Nelson and I met at the MTA to examine and assemble the propellant feed tanks and the associated valve manifolds that will be used in the static firing of the 1936 GALCIT engine replica the society built from a few archival sketches from Frank Malina and Jack Parsons.

RRS member Bill Nelson was able to repair the internal check valve inside our hydrotest pump and conduct a hydrostatic proof pressure test on both welded stainless pipe tanks we will use in firing the replica of the 1936 GALCIT liquid rocket engine prototype as part of the LACMA funded project for American Artist. Both tanks held 1.5 times the design pressure for 5 minutes without leak or bulging as expected.

Bill Nelson and I filled three of the larger gunny sacks with the sand that normally collects in certain areas around the MTA. More will be necessary to build a wall similar in size and appearance to those seen in archival photos in the Arroyo Seco in October 1936. The substantial weight of each required a motorized means of transport, but we were able to lay them next to the replica engine and vertical spring stand for a sense of scale.

Some of the other feed systems require further adjustment and design changes, but all is progressing nicely to an expected first firing with regulated nirogen gas pressurized liquid methanol and regulated gaseous oxygen propellants in the month of May 2024.

For use of the RRS MTA, contact the RRS president.

Next RRS monthly meeting will be Friday, May 10th, at the front office of the Compton/Woodley Airport at 7:30pm.


One thought on “MTA Firing Event, 2024-04-27

  1. Hi, I’m Bill Claybaugh’s wife & am concerned that I’ve not heard from him as promised this evening, April 30, 2024; he reported an engine test at MTA RRS site today ended after first rocket “blew up …after pressure went to1800psi.” He’s a reliable correspondent when out at MTA, so his silence is alarming. Do George G or Dave C have info on him? Sorry for the bother; we’re very concerned. He seems to be receiving texts but not replying, which is not like him. Thanks for your help, Ellen, (202) 631-3451, ph/text .

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.