MTA launch event, 2021-05-29

by Dave Nordling, Reaction Research Society


The Reaction Research Society held a launch event at the Mojave Test Area mainly to support the UCLA Prometheus team for a static fire test of their high powered hybrid motor. UCLA chose one of the largest nitrous oxide hybrid motor designs, the M1575, made by Contrails Rocketry. Dave Crisalli was the pyrotechnic operator in charge for this event. I was his apprentice for the hybrid static fire.

There were three main activities at this event. The first was the UCLA Rocket Project making their preparations to launch their ethanol and LOX vehicle from the Friends of Amateur Rocketry (FAR) site from the 60-foot rail. FAR is just to the south of the RRS MTA where the UCLA Rocket Project had twice in one day static fired their 750 lbf liquid propellant rocket engine just four weeks earlier on 05-01-2021.

Weather conditions were ideal with winds being nearly still for most of the morning. This makes little difference for the hybrid motor static fire testing at the RRS MTA which was the second project by UCLA. Wind would factor heavily in the flight of the UCLA’s liquid rocket.

The third planned activity for UCLA was a series of model rocket flights from several high school teams mentored by UCLA graduate and undergraduate students. Still winds made for easier recovery of the first rockets launched that day.

UCLA Prometheus team prepares for static fire at the RRS MTA on 5-29-2021
Dave Crisalli gives the MTA safety briefing for the event in the loading area where the model rockets were assembled for flight.
UCLA graduate students conducted the model rocket launches from just west of the large test stand at the MTA

UCLA at the end of each Spring Quarter conducts a launch event where student groups build small rockets with egg payloads using single and dual-stage vehicles with model rocket class motors (G and under). UCLA graduate students and Professor Mitchell Spearrin were leading this event.

It is good experience for beginners and experts alike to build and fly model rockets., The RRS has it’s own such internal program called the Yoerg Challenge which is to motivate all members to build and fly a model rocket kit at least once from the RRS MTA. The RRS is known as an experimental society and not limited to the model rocket code, but we are also fully supportive of all forms of propulsion as long as it is safely conducted and compliant to the regulations set by the state of California.

As the UCLA hybrid rocket team was making their system checks, they discovered a problem in their nitrous filling system and valve commands. During this diagnostic period, some of the RRS members went to the nearby FAR site to see how the UCLA liquid rocket preparations were progressing.

UCLA’s liquid rocket set on the 60-foot rail launcher at FAR. The team preparing the vehicle for erecting, loading then flight.
RRS members from left to right, Bill Inman, Waldo Stakes, John Wells and Manuel Marquez, inspect the UCLA liquid rocket on the 60-foot launcher deployed at the FAR site.
A few last minute fixes and the rocket was made ready.
The liquid rocket sits on the rail before raising it for launch.
UCLA’s rocket is in position getting ready to clear the area for propellant loading and pressurization operations.

Some of the RRS members remained at the FAR site to witness the launch. After two years of design, planning, build and world pandemic, the UCLA team liquid rocket launch was an amazing success. Due to the relatively low winds that day under clear skies, recovery was made just under a mile away. Preliminary data from telemetry confirmed a new university team altitude record of 22,000 feet. It was an amazing sight to witness from the observation bunker at the RRS MTA.

UCLA’s liquid rocket had a perfect launch on 5-29-2021 setting a new altitude record of 22,000 feet by a university team. Photo by Xavier Marshall, RRS.

The UCLA Prometheus team had corrected their initial electrical problem and began the series of procedural checks to familiarize the new members of the hybrid rocket team. Some minor adjustments of the motor mount alignment was necessary before getting into test.

The UCLA Prometheus team makes some adjustments to better align the hybrid motor in the vertical skid mounted to classic I-beam at the RRS MTA.
The nitrous oxide K-bottle sits inverted in the sloped stand to allow the liquid to flow from the port. Some nitrous oxide bottles come with an internal siphon line to avoid having to invert the container. The bottle is also being chilled with ice to keep the oxidizer sufficiently dense and improve performance in hot-fire.
The top bulkhead of the hybrid motor is attached to the load cell for thrust measurement. A pressure transmitter is tapped into the nitrous oxide volume to further gauge performance.
The high-powered hybrid motor by Contrails uses four 1/4-inch fill lines and a single smaller vent line from the same floating injector at the mid-point inside
Dave Crisalli (right) inspects the hybrid motor on the test rails before the firing
UCLA Prometheus team tracks their written procedures as they progress to hot-fire in the old blockhouse.

The hybrid motor firing proceeded without further problems and resulted in a spectacular test meeting expected performance. Continuous thrust levels over 600 lbf were recorded but data analysis is still ongoing.

The hybrid motor at startup.
The UCLA hybrid motor at full thrust. Chamber pressure was over 1000 psia.

The team had a second hybrid motor grain ready for another firing so they proceeded with disassembly and inspection of the parts. The floating injector seals were still in good condition but the graphite nozzle having survived many prior hot fire tests did not survive that day’s test. Although the throat was in good condition, the inlet taper had cracked requiring a replacement the team did not have.

The top half of the floating injector with its internal siphon tube protruding up to near the top bulkhead.
The floating injector being removed from the lower half containing the spent fuel propellant grain.
The floating injector was removed after hot-fire and the dual O-ring seals were inspected. Seals were ok for re-use.
The nozzle assembly did not pass inspection after the first and only hot-fire on 05-29-2021.
The graphite nozzle fractured at the inlet taper from the first and only firing that day.

UCLA Prometheus was pleased with the results from the single firing and will proceed with integrating the motor into their flight vehicle for a launch from FAR on June 19, 2021. The RRS will hold an event at the Mojave Test Area on this same Saturday for member projects and will observe the flight from our northern vantage point.

UCLA avionics team conducted a few tests on the GPS tracking module that will fly on their vehicle in June 2021.

In the last hours of the day, after most of the UCLA liquid and hybrid teams had cleared the area, packaged and carried away their trash, packed their equipment and departed the RRS MTA and FAR sites. The UCLA avionics team remained at the MTA to conduct another series of tests on the GPS tracking system. The society was glad to support this diligence which will help assure success in one of the most important aspects of rocketry which is data acquisition from telemetry. If there is no data, it didn’t happen.

For any group interested in using the RRS MTA for their propulsion related projects, download one of our Standard Record Forms from our RRS.ORG website and submit this request to the RRS president. The society has had a long relationship with UCLA and USC, but we are also supportive to any amateur, professional or academic groups wanting to learn from test.

president@rrs.org


MTA launch event, 2018-10-27

The Reaction Research Society (RRS) held another launch event at our private testing site, the Mojave Test Area (MTA), on October 27, 2018. We had a really big day in hosting a launch event for Weigand Elementary School and supporting the projects of several of our members. This was one of the more perfect days for a launch. The day time temperatures stayed below 90 degrees Fahrenheit and the winds were nearly still the whole day.

Old Glory slowly waves in the light breeze of the cool late October morning in the Mojave Desert

Our pyro-op for the event was John Newman, of the Friends of Amateur Rocketry (FAR) group.

Friends of Amateur Rocketry – webpage

John allowed myself, Dave Nordling, and Larry Hoffing apprentice under him for the event as we are both in training to become licensed pyrotechnic operators in California.

John Newman (right) from Friends of Amateur Rocketry (FAR) talks with Mr. Oswald (left) and Dr. Kasparian (middle) at the RRS MTA, 10/27/2018

John Newman (left, behind the wall) and Larry Hoffing (right) oversee the loading of micrograin propellant at the RRS MTA

The RRS welcomed Weigand Elementary School and the Los Angeles Police Department’s (LAPD) Community Service Program (CSP). They had just finished the six session program and had ten (10) alphas ready to launch.

Frank Miuccio shows one of the two RRS blockhouses to the students of Weigand Elementary School

RRS member, Michael Lunny, had come out to the MTA the week before to help Osvaldo with mixing of the micrograin propellant. The simple mixture of zinc and sulfur powders is relatively safe, but requires time to properly mix and load. With the larger demand for alpha rockets with school projects and our growing membership, it’s no longer a process that can be done in the early morning hours before launch day.

Osvaldo Tarditti and Michael Lunny at the RRS MTA, 10/27/2018, having done the hard work of loading the rockets the week before

The ten alphas from Weigand Elementary and Michael Lunny’s alpha in white, all loaded, tagged and ready to go

RRS member Alastair Martin was at our event doing a great job in video-recording many aspects of our event. Alastair and Bill Janczewski, both newly elected to the position of Media Coordinator at the RRS, have been helping expand the presence of the RRS in social media and to the public at large.

Alastair Martin, armed and ready, in the RRS MTA blockhouse

Alastair gets his camera ready for the next alpha launch

Alastair got a lot of great shots and video-footage which I’ll share as they come in. Some of the short videos and photos from the 2018-10-27 event are already posted on the RRS Instagram page.

Follow the RRS on Instagram – ReactionResearchSociety

Just before the briefing, two of our new members had the chance to experience loading their own alpha rockets with the micrograin propellant. Xavier Marshall and Wilbur Owens were coached in the process and got a first-hand feel for classic micrograin rocketry. Michael Lunny’s alpha rocket was already set to go the week before when he helped Osvaldo load the ten alphas for Weigand Elementary.

Wilbur Owens loads his alpha rocket, one cupful at a time, gently bouncing out the air pockets as he goes

Once the alpha propellant tube is full of propellant up to the bolt holes, Xavier Marshall prepares to install his nozzle with the electric match and burst disk which retains the powdered propellant inside

A close-up view of the alpha nozzle with its plastic burst-disk and electric match resting on the interior side, the electric match wires protrude out the bottom (held back by carpenter’s tape just for convenience)

[SAFETY BRIEFING]

We conducted our safety briefing at the beginning of the event before all present. We discussed the many natural and man-made hazards to help everyone become aware and be more safe. John Newman made us aware of a native species of snake, the Mojave Green Rattlesnake, which is sometimes known to become aggressive when discovered. The Wikipedia page is linked below.

the Mojave green rattlesnake

Mojave Green Rattlesnake – Wikipedia

Frank also reminded everyone about keeping their distance from the Desert Tortoise, which is a federally protected species that is also indigenous to the Mojave desert and the MTA. It isn’t very common to see these animals during the height of the day, but everyone needs to be aware and take heed of their surroundings to protect themselves and the environment.

The federally protected Desert Tortoise

Desert Tortoise – Wikipedia page

Besides avoiding heat exhaustion and spiders, collecting and properly disposing of trash, and maintaining their hydration, all attendees must remain under the cover of our reinforced bunker during hazardous operations. With the conclusion of the briefing, we proceeded to a propellant demonstration to show the combustion process on a sample of composite propellant and micrograin powder.

Small sample of composite grain propellant burns hot enough to cut through the steel case supporting it, slow burning but very potent

The bright yellow plume of burning micrograin propellant, zinc and sulfur together go up pretty fast

The next step was getting everyone into the bunker, while John Newman conducted the event as our pyro-op. Larry and I were on hand to assist in the loading and readiness for firing. The RRS alpha had a steel box frame launcher which is our preferred method of guiding these speedy metal rockets up and downrange west.

We got started loading them into the rack by the numbers. The kids did a great job of painting them and making them their own. Most importantly, they label them with large numbers. The color of the fins matter the most since that is the only part left sticking out of the ground at the end of flight.

First of ten alphas right at liftoff

Same rocket just a few frames later

After launching all ten of the rockets, we all took our lunch break. The day was very pleasant, but we all enjoyed a little bit of shade. After lunch, LAPD CSP packed everyone up for the long drive to Los Angeles.

Frank talks with the kids of Weigand Elementary after having lunch after a great launch

[MEMBER PROJECTS]

We started working on membership projects starting with launching Michael’s alpha. It’s always rewarding to launch your first alpha and it’s an experience that never gets old. It’s usually one in a series to come. Big thanks to Michael for helping the society get ready for the event.

Xavier Marshall tried a new approach to launch by allowing me to use the fly-away railguide that I had customized for the 1.25″ RRS alpha propellant tube. Additive Aerospace makes many standard models which this one was derived from the 38 mm design.

Additive Aerospace – fly-away rail guides

Xavier Marshall’s RRS alpha clamped into the launch rails

Flyaway railguide clamped around an RRS alpha

Xavier Marshall inspects his first alpha as it sits on the rail

The first rail launch of an RRS standard alpha was successful. The flyaway railguide seemed to hold as the micrograin rocket sped off the rails. We took video from the facing side of the rail to get a better look at the operation. I was able to get one good still from my camera phone video from the blockhouse. You can see the railguide just above the fins as the rocket has cleared the rails so the flyaway railguide has sprung open and now is free to tumble away.

Xavier’s rail launched alpha rocket makes a clean path up the 20-foot guide, rail guide still seen near the rocket just after clearing the rail

The railguide fit to the alpha very well but the rail buttons were a little sticky as the rocket was slipped into place. I think the dusty aluminum rail is more to blame for this. The workmanship on these flyaway railguides from Additive Aerospace is quite good. Flying one of these devices with a micrograin rocket was expected to be challenging given the high acceleration that micrograin rockets are known for.

The railguide was not recovered intact. I recovered most of the pieces and the plastic end pieces showed fractures. It’s not clear if the railguide broke on the ground from the fall, but given the spread of the pieces, it could be possible the sudden acceleration of the RRS alpha fractured the lower clamp as the rocket took off. Review of Alastair’s video in slow motion may answer what the failure mode is. All pieces were recovered within 50 feet of the rail.

The recovered pieces of the flyaway rail guide. A successful launch but the mechanism didn’t survive for more than one attempt.

Jack Oswald and his team had a set of sample end-burner motors with their next batch of propellant for burn-rate testing. After setting up the first motor, a key part was missing and the pressure transducer had to be mounted too close to the exit plume. It was expected that the pressure transducer wouldn’t survive the first burn but the test was expected to take good data. The test was executed, but unfortunately the test over-pressurized due to the grain separating from its liner during the initial startup. A lot was learned but the other motors were not able to be tested.

Jack Oswald inspects his test motors as he moves them to safe storage before test

Jack’s BEM test starts out okay. A leakage stream is seen coming out the side.

Just a second later, Jack’s test rig overpressurizes and the nozzle plate pops off

My last photo taken of that day was the last of the three member alphas sitting in the box rails ready to go. Wilbur Owens had the honor of flying his first alpha rocket at sunset.

Wilbur Owens takes a picture of his first alpha ready to fly away

The sun setting at the RRS MTA, Wilbur Owens’ first alpha rocket sits ready to fly out of the rails

With the last of our thirteen alphas flying out, we proceeded with the first firing of the horizontal thrust stand built to test loaded alpha propellant tubes. Osvaldo made some modifications to my stout steel frame adapted to the concrete slab in front of the old RRS blockhouse. Dave Crisalli poured this concrete slab as a working platform in the 1970’s. USC in recent times drilled the slab with 1/2″ female anchor bolts to test small 50-lbf motors. It made sense to use this existing foundation for our horizontal thrust stand.

Matteo Tarditti installs the completed RRS horizontal thrust stand to the concrete slab

Osvaldo uses his 185 lbf son, Matteo, as a quick load cell calibration check as Jack Oswald observes the 1124-lbf ranged load cell output on the laptop in the blockhouse. Awkward, but effective.

After some initial software and operator problems with getting and keeping the S-type load cell calibrated, the system was ready to go.

It has been MANY years since the RRS had made direct impulse measurements of an RRS alpha micrograin rocket, but we felt this hardware would be useful for other similar projects in our near future. Although horizontal testing of a micrograin rocket is not indicative of the actual vertical flight, we felt we could still learn much from this testing.

A simple bottle jack (commonly used for changing an automobile tire) was used as a load cell calibration device (pressure gauge was damaged in handling)

We retreated to the blockhouse and got the testing underway. After two false starts from the bunker, we got the alpha motor to fire in the horizontal position and captured it on video.

The results were good in that the load cell readings were captured and the structure adequately retained the rocket in its very brief (0.4 second) thrust bit. Osvaldo crunched the numbers from the readings we got from the test. Load cell readings indicated we reached a peak thrust of 544 lbf. Burn time was only 0.4 seconds.

This is the raw data from the alpha firing in the (translating) horizontal thrust stand; we need more data

Results from the alpha static firing on 2018-10-27

The RRS is very grateful to Interface Force Inc. of Arizona for their generous donation of the S-type load cell we’re using.

www.interfaceforce.com

An S-type load cell, made by Interface Force Inc.

These devices are not very expensive ($350?? each) and are available in sizes from just 100 lbf to up to several thousand pounds. Button cells are more compact and also work well, but they tend to be more expensive.

The big surprise was that our concrete pad wasn’t as well secured as we had hoped. The pad was only 6 inches thick which means that the slab was only an inch or so beneath the surface. I do recall being told this slab poured by RRS member, Dave Crisalli, in the 1970’s, was only intended to be a working surface and that it wasn’t very deep. USC in recent times had drilled the pad with 1/2″ female anchor bolts for a small 50-lbf.

The concrete slab held fast initially, but suddenly broke free displacing itself by over half its length.

Another observation was that we get a little bit of gas leakage at the end of the burn at the bulkhead. This has been seen in other alpha flight videos and thus it wasn’t a surprise.

Despite the moving target of the whole stand moving, just after the alpha fires, you can see gas leakage at the bulkhead

Osvaldo did not see any damage to the seals when we disassembled the rocket from the stand. This may be a weakness of the seal design but it doesn’t seem to harm performance. More experimentation will shed light on this.

Check out the RRS Instagram page to see this footage. I’ll be uploading it to our YouTube page soon as Instagram has a 60-second time limit for video.

While we were conducting test operations at the MTA, Wilbur Owens located his rocket downrange and started the laborious process of alpha recovery by shovel. Osvaldo’s extractor tool has made short work of this step, but I don’t know if it was available that day?

[PROPELLANT DISPOSAL OPERATIONS]

Jack and his team had a quantity of unspent composite propellant which had to be properly disposed. He had quite a bit from a failed attempt to cast a previous motor that hardened too quickly. The RRS MTA is a good place to do this. With the low winds, we are able to safely touch off the two batches in the waning hours of the day.

The first burn was the smaller of the two. The sun had already set so we were losing the light fast.

The first propellant disposal burn was a bit brighter than I thought but manageable.

With the light almost gone, the second batch lit up the night just for a brief moment before fading.

2nd propellant disposal burn starts off with the last of the daylight fading at the MTA

The second propellant disposal burn at its brightest, but quickly fades as the burn safely completes

[IN CONCLUSION … THINGS COMING UP]

Frank had said that the LAPD CSP is looking to start the next school program in January of 2019. We are very grateful to the LAPD CSP for their continuous support to our classes. The RRS is proud to help the community by sharing the hobby we love.

As mentioned in our last monthly meeting, the next event with the RRS will be our visit to Chapter 96 of the Experimental Aircraft Association (EAA). RRS members, Xavier Marshall and Wilbur Owens, invited the RRS membership to join them at their hangar at the Compton Airport on Saturday morning, November 3rd, at 10:00 AM. The RRS is interested in getting inexpensive shop space that is reasonably convenient to our membership residing in the Los Angeles area. The RRS is looking to help cultivate practical machining skills such as lathe work and milling. Many of our members already have these skills to some degree, but want to help other members become more adept at making their own nozzles, nosecones and other rocket parts.

The next RRS meeting will be November 9th at 7:30PM at the Ken Nakaoka Community Center in Gardena, California. We hope to have Jack Oswald and his team present their results. Despite the failure of the first and only sample hot-firing a great deal was learned which will make the next set of tests more likely to succeed.

September 2018 meeting

The RRS held its monthly meeting for September 2018 this Friday, the 14th, at the Ken Nakaoka Community Center. We were displaced from our usual meeting room, but got the upstairs room F with the window view which was pretty nice. We were well attended, but got a very late start. Meetings begin at 7:30pm. There were several little events at the meeting which did not make the agenda.

Alastair Martin, Bill Behenna and Richard Garcia at the September 2018 meeting of the RRS

[X1]
The RRS was glad to welcome new student member, Bailey Cislowski. We had a short little social event at the end of the meeting which was a nice way to end the week.

Bailey Cislowski and RRS VP, Frank Miuccio

Also, the RRS was glad to re-welcome new members Wilbur Owens and Xavier Marshall. Wilbur had his first rite of passage in the RRS by taking his first standard alpha rocket. He’s looking forward to filling it with micrograin at the next launch event on October 27th. It will be one of many to come!

Xavier Marshall and Wilbur Owens; Wilbur gets his first RRS alpha

[X2]
Xavier invited the RRS to come tour the Experimental Aircraft Association’s local chapter at the Compton Airport. The EAA holds regular events including educational events with local kids.

Experimental Aircraft Association, Spirit of 96

Contact information for the local chapter of the Experimental Aircraft Association in Compton

[X3]
RRS member Alastair Martin is active with the Mars Society which just completed their 21st annual International Mars Society convention at the Pasadena Convention Center. If Alastair can oblige at our next RRS meeting, I have asked him to give the RRS a report on his experiences at the event.

Mars Society – home page

Besides film-making and photography, another one of Alastair’s talents is screen-printing on shirts. I recently had the RRS logo added to this bright-yellow shirt that I bought to better survive the hot Mojave desert climate of the RRS MTA. These bright-yellow “Ultra-Club” cool & dry shirts can be bought on Amazon in a variety of sizes besides the “XL” that I wear.

The RRS logo proudly worn on a fall afternoon

[X4]
I recently purchased a fly-away rail guide from Additive Aerospace. This company specializes in model rocketry parts including this simple clamp-on device that obviates the need for mounting rail buttons on the smaller rockets.

Additive Aerospace – fly-away rail guides

Additive Aerospace was nice enough to customize their standard 38mm design to fit the slightly smaller (1.25″ diameter) RRS standard alpha propellant tube. The fit check was perfect and the next step will be to attempt to launch an alpha from the 80-20 rail launcher we have.

Flyaway rail guide customized for an RRS standard alpha micrograin rocket is a good fit (and held closed by my hand).

Flyaway rail guide has two pairs of rail buttons to hold the rocket on the launch rail.

The flyaway rail guide is spring-loaded to open once the rocket travels up and off the launch rail, then simply falls away as the rocket speeds off

1.5-inch 80-20 aluminum rail extrusion, rail buttons are guided down this path on the rocket’s way up and away

12-foot aluminum 80-20 rail launcher, RRS MTA bunker in the background

[X5]
Osvaldo completed the cylinder piece of the ballistic evaluation motor (BEM) assembly that I designed for testing the burn rate of solid propellant samples. I forgot to bring the graphite nozzle pucks that Richard Garcia made for the assembly. Once the gaskets are fitted and the pressure transducer is checked out, we can begin to prepare 4-inch long samples of propellant into the 3/4-inch PVC tubes for which the BEM was designed to fire. This will be a useful tool in characterizing the AP/HTPB/Aluminum solid propellant batches that will be used in the prototypes of the SuperDosa project. Larry has already made a small batch of the RRS standard recipe solid propellant. Some of these first grains may be used in the propellant burn demonstration at the next RRS MTA launch event.

RRS BEM cylinder sits on top of the bottom plate, top plate in the background

[X6]
Thanks to Osvaldo again for his help with the two-stage alpha rocket that I designed. In this prototype, the payload tube was made longer for the possibility of a parachute recovery system for the upper stage. The 1-1/4″ PVC pipe was machined down to 1.600″ OD to fit inside of the standard alpha’s aluminum payload tube. The steel nozzle design, although simpler to make, may prove to be excessively heavy and throw off the mass balance of the rocket. The graphite nozzle design with its split retaining ring may be the better choice. More work is needed before attempting to fly this prototype design including completing the inter-stage timer circuit for deploying the in-line second stage motor in flight.

Two-stage RRS alpha rocket; second stage with a small AP/HTPB/Aluminum solid grain motor

[X7]
Since August, Osvaldo has made some progress in testing the load cell that will be used in the horizontal thrust stand. The bottle jack he used was tapped with an analog pressure gauge and the compression load into the load cell can be accurately measured. Despite some seal leakage problems with the older bottle jack, the results he and Matteo gathered from his data acquisition unit showed our S-type load cell matches the calibration sheet fairly well.

Load cell compression testing rig using a pressure gauge and a bottle jack

Finally, we got to some of the originally scheduled agenda topics:

[1]
Frank Miuccio gave an overview of the next educational event that had its first event of the series held today at Weigand Elementary school. This is the latest in the series of events we’ve had with the LAPD CSP program. The final event will the launch of the alpha rockets at the RRS MTA on October 27, 2018. Dave Crisalli will be our pyro-op at the event.

Osvaldo, Larry and Frank listen at the September 2018 meeting

[2]
We didn’t have another launch event planned yet for this year, but it’s always possible.

[3]
Richard Garcia gave a brief overview of his successful hot-fire test of his 1000-lbf kerosene-LOX motor on August 18, 2018. His pintle injector with an ablative chamber insert worked very well despite a leaking fitting at the LOX port. Some of the equipment did not work completely as hoped, but the overall test produced a stable thrust profile and clean cut-off. Richard put a lot of work into this first design which helps pave the way to the RRS standard liquid rocket project which will remain a regular topic with the RRS moving forward.

Richard Garcia after presenting his liquid rocket testing results; a proud day

Richard then moved into the details of integrating a liquid motor into a rocket body. Using commonly available parts and a few simply made connecting pieces, a simple but effective liquid rocket design can be made with a modest budget easily affordable to universities and individuals. This is still a work in progress, but the RRS is committed to bringing this project to fruition. We look forward to the next engine build which will likely be in a series of builds that will ultimately lead to the RRS standard liquid rocket design.

Richard’s Solidworks model showing both propellant and pressurant tanks plumbed into the rocket body

[4]
We had a very short discussion about the RRS expanding our roster of pyro-ops. Chris Kobel of ROC presented at our August meeting and gave a lot of practical advise on this subject.

Many of our next member “class” including myself have already written their rocket resumes to describe their experience with rocketry and have begun soliciting licensed pyro-ops for recommendation letters which is not a task to be taken lightly. Beyond the RRS regular and lifetime membership, the Rocketry Organization of California (ROC) was willing to help RRS members learn and earn their recommendation letters by attending and participating at events at ROC. The Friends of Amateur Rocketry (FAR) have also been very helpful to those of us who are aspiring to be new pyro-ops. The rocketry community is a small one and it is good to have the support of like-minded organizations to keep the membership across all societies safe, strong and active.

ROC holds monthly events on the 2nd Saturday of each month. I have been working on organizing a group of RRS members to go out to the next ROC event to get to know our smoke-and-fire sisters and brothers.

Rocketry Organization of California – Roctober event on Oct 13-14, 2018

To all of our membership interested in making this trip to the Lucerne Valley on October 13th, contact the RRS secretary. If we have a good number of people interested, we can make this a worthwhile trip. This trip would be on the Saturday immediately following the RRS meeting on that Friday night (Oct 12th). ROC will be holding an event with school kids, but if the RRS members bring their rocket resumes we may be able to have a conversation with the ROC leadership and get some advice and training. If we get a few members to ride out, I’ll contact ROC to let them know we’re coming. Please let me know by Friday, September 28th.

[IN CLOSING]
Next meeting of the RRS will be October 12th, which is always the 2nd Friday of the month. The quarterly update for the SuperDosa project will be part of the agenda as well as several items we did not cover in our agenda. All RRS members are welcome to make suggestions for discussion topics at future meetings. For those wanting to add topics, please let me know. I will post the preliminary agenda topics at the 1st of the next month on the RRS website Forum page.

As always, please keep your email and contact information up to date with the society. We’re glad to see so many new members and returning members. Even if you can’t make it to Gardena on a regular basis, just send us a line to say “hello” and tell us how you’re doing.

secretary@rrs.org